Notice for Notification of Contract Award Notice for Contract Identification No; ACCESS-DOR-W-BGC-ICB-01 (Lot 1 and Lot 2)
२०८१ आषाढ ११
Government of Nepal
Ministry of Physical Infrastructure and Transport
Department of Roads (DOR)
Development Cooperation Implementation Division
Accelerating Transport and Trade Connectivity in Eastern South Asia (ACCESS), Nepal, Phase-I
Babarmahal, Kathmandu
Contract Award Notice
Date of publication: June 24, 2024
Pursuant to ITB 45.2, this is to notify that the Department of Roads, Development Cooperation Implementation Division, ACCESS has awarded the following contract invited through Notice No. ACCESS/02/080-81 as per following:
Contract No: ACCESS-DOR-W-BGC-ICB-01 (Lot 1 and Lot 2)
Description of Works: Upgrading of Butwal-Gorusinghe-Chanauta Road and Bridges [CH: -590+000 Km to CH: 640+000 Km, East-West Highway]
Selection Method: Request for Bids Works (Without Prequalification)
S.No. |
Name of Bidders |
Bid price (read out) |
Evaluated Bid price (excluding VAT and PS) |
Name of Bidders |
Bid price (read out) |
Evaluated Bid price (excluding VAT and PS) |
Remarks |
ACCESS-DOR-W-BGC-ICB-1 (Lot 1) |
ACCESS-DOR-W-BGC-ICB-1 (Lot 2) |
||||||
1. |
CHINA FIRST HIGHWAY ENGINEERING CO., LTD (Hard Copy) |
11,947,673,040.59 |
11,377,662,901.61 |
CHINA FIRST HIGHWAY ENGINEERING CO., LTD (Hard Copy) |
8,982,053,209.47 |
8,534,909,401.67 |
|
2. |
EVRASCON-KALIKA JOINT VENTURE (Hard Copy) |
9,367,744,685.91 |
7,816,734,135.86 |
EVRASCON-KALIKA JOINT VENTURE (Hard Copy) |
6,568,562,664.67 |
5,424,625,700.68 |
|
3. |
Xinjiang Beixin Road & Bridge Group Co., Ltd. (Hard Copy) |
8,824,122,818.00 |
8,277,592,173.39 |
Xinjiang Beixin Road & Bridge Group Co., Ltd. (Hard Copy) |
6,777,376,705.00 |
6,353,961,203.17 |
|
4. |
COVEC-CREGC Joint Venture (E-Bid) |
8,867,116,764.15 |
7,216,083,534.75 |
COVEC-CREGC Joint Venture (E-Bid) |
7,182,382,302.35 |
5,861,758,817.44 |
|
5. |
SGEC-KSNS JV (E-Bid) |
8,185,936,868.95 |
6,760,536,484.60 |
SGEC-KSNS JV (E-Bid) |
5,841,338,951.35 |
4,794,622,521.55 |
|
6. |
Shandong Luqiao Group Co., Ltd. (E-Bid) |
9,238,205,317.71 |
7,691,747,496.20 |
Shandong Luqiao Group Co., Ltd. (E-Bid) |
6,764,840,090.04 |
5,611,880,166.41 |
|
7. |
ZICG-LAMA Joint Venture (E-Bid) |
9,419,191,146.94 |
7,537,976,998.00 |
ZICG-LAMA Joint Venture (E-Bid) |
6,795,119,375.11 |
5,300,454,952.78 |
|
8. |
SCEGC-ANS JV (E-Bid) |
8,216,492,355.74 |
6,502,498,510.60 |
SCEGC-ANS JV (E-Bid) |
5,880,526,934.38 |
4,636,130,066.45 |
|
9. |
Sinohydro - Yellow River JV (E-Bid) |
10,225,192,317.61 |
8,136,929,105.44 |
JTEC-SWACHCHHANDA JV (Hard Copy) |
5,292,402,203.70 |
5,299,346,705.20 |
|
10. |
AZVIRT-RAMAN JV (E-Bid) |
10,057,189,860.03 |
8,416,512,577.90 |
SINOHYDRO-SCEB15 Joint Venture (E-Bid) |
7,361,122,493.26 |
6,139,563,708.59 |
|
11. |
|
AZVIRT-RAUTAHA Joint Venture (E-Bid) |
6,484,303,187.33 |
5,283,163,159.35 |
|
Successful Bidder:
S.N. |
Contract No. |
Description of Works |
Name of the Bidder |
Contract Amount (With VAT & PS) |
Contract Duration |
1. |
ACCESS-DOR-W-BGC-ICB-1 (Lot 1) |
Upgrading of Butwal-Gorusinghe-Chanauta Road and Bridges [CH: 590+000 Km to CH: 615+000 Km, East West Highway] |
M/S SCEGC-ANS Joint Venture, Bharatpur, Chitwan, Nepal |
NPR 7,894,353,963.98 |
3 years Construction and 5 Years PBMC (Total 8 years) |
2. |
ACCESS-DOR-W-BGC-ICB-1 (Lot 2) |
Upgrading of Butwal-Gorusinghe-Chanauta Road and Bridges [CH: 615+000 Km to CH: 640+000 Km, East West Highway] |
M/S SCEGC-ANS Joint Venture, Bharatpur, Chitwan, Nepal |
NPR 5,662,242,477.09 |
3 years Construction and 5 Years PBMC (Total 8 years) |
Rejected/Non-Responsive Bidder:
Contract no. ACCESS-DOR-W-BGC-ICB-1 (Lot 2):
The validity of bid security submitted by SWEG-ANK Joint Venture is less than requirement. Hence The Bid Evaluation Committee decided the bid submitted by SWEG-ANK Joint Venture to be non-responsive.